• 中文核心期刊
  • 中国科技核心期刊
  • RCCSE中国核心学术期刊
  • Scopus, DOAJ, CA, AJ, JST收录期刊
高级检索

察哈素煤矿厚煤层综采工作面煤柱合理宽度模拟研究及实践分析

Simulation Study and Practice Analysis of Rational Width of Coal Pillar in Fully-mechanized Face of Thick Seam in Cahasu Coal Mine

  • 摘要: 煤柱宽度的合理留设是确保厚煤层双巷布置综采工作面安全回采的关键。针对察哈素煤矿因煤柱留设不当而导致回采巷道大范围破坏的问题,采用数值模拟的方法研究了巷道失稳的原因和煤柱的合理宽度。结果表明:工作面煤柱宽度不足导致巷道两侧支承压力叠加是巷道维护困难的主因。通过对比不同煤柱留设条件下采场应力、收敛变形和塑性区分布情况,得出该矿合理的煤柱宽度为35 m。现场实践表明,该方案的技术及经济效益显著。

     

    Abstract: The reasonable width of coal pillar is the key for ensuring safe production of fully-mechanized working face with double- roadway layout in the thick seam. To aim at the problems of coal roadway large-range breakage caused by unreasonable coal pillar dimension in Chahasu Mine, numerical simulation method was used for researching the reasons of the roadway instability and the reasonable width of coal pillar. The results showed that insufficient width of the coal pillar was the main reason leading to the abutment pressure superposition on the roadway two sides and the difficult maintenance of the roadway. Through the comparison of the stope stress, convergence deformation and plastic zone distribution under the condition of different width of the coal pillar, it was obtained that the reasonable width of the coal pillar in this mine was 35 m. The practice indicated that this scheme had significant technological and economical benefits.

     

/

返回文章
返回