基于全周期现场监测的富水软岩采场劣化协同防控策略与煤柱优化

Coordinated prevention and control strategy for water-rich soft rock stope deterioration and coal pillar optimization based on full-cycle field monitoring

  • 摘要: 针对西部侏罗系弱胶结富水软岩矿井水-岩耦合劣化、水沙突涌、巷道非对称大变形,以及采动扰动响应机制不清、煤柱参数适配性差等技术难题,单纯依靠支护技术手段无法从根源解决。以内蒙古上海庙矿区114153综采工作面为工程背景,开展全周期灾害防控与参数优化研究。遵循“大水防控、小水管理、强化支护、协同治理”的理念,采用“双层双向扇形”布孔全域疏放水技术,配合“锚网索喷+反底拱”全断面联合支护体系,通过回采巷道全断面位移监测、深部围岩应力定点实测的手段,系统探究富水软岩巷道变形时序演化、非对称采动响应及应力分区规律,量化动压影响范围并优化区段煤柱参数。结果表明:工作面累计疏放顶板砂岩水399 545 m3,从源头阻断软岩水致劣化链条,消除水沙突涌隐患;受动压扰动时,实体煤巷道、邻空巷道综合收敛率分别控制在7%、12%,围岩变形可控;采动动压平均超前影响距离达255.6 m,远大于东部硬岩矿区,巷道侧向0~28 m为稳定卸压区,28 m以深为应力增高区。结合稳定性与资源回收效益,确定工作面最优区段煤柱留设宽度为12 m,大巷保护煤柱宽度不小于200 m。

     

    Abstract: To address technical challenges in Jurassic weakly cemented water-rich soft rock mines in western China, including water-rock coupling deterioration,water-sand inrush,asymmetric large deformation of roadways,unclear mechanisms of mining-induced disturbance response,and poor adaptability of coal pillar parameters—problems that cannot be fundamentally solved by support technology alone—this study takes the No. 114153 fully mechanized mining face in the Shanghaimiao Mining Area of Inner Mongolia as the engineering background and conducts full-cycle research on disaster prevention and control and parameter optimization. Adhering to the principle of “major water hazard prevention and control, minor water management, enhanced support,and coordinated governance”,a full-area water drainage technology with a double-layer bidirectional fan-shaped borehole layout is adopted,combined with a full-section combined support system of “bolt-mesh-cable-shotcrete + inverted arch”. Using full-section displacement monitoring of mining roadways and fixed-point in-situ measurements of deep surrounding rock stress,this study systematically investigates the temporal evolution of deformation,asymmetric mining-induced response,and stress zoning patterns in water-rich soft rock roadways;quantifies the influence range of mining-induced dynamic pressure;and optimizes section coal pillar parameters. The results show that the cumulative volume of drained roof sandstone water from the working face reached 399 545 m3,thereby cutting off the water-induced deterioration chain of soft rock at the source and eliminating the risk of water-sand inrush. Under mining-induced dynamic pressure disturbance,the comprehensive convergence rates of the solid coal roadway and the goaf-side roadway were 7% and 12%, respectively, indicating that the surrounding rock deformation remained controllable. The average advance influence distance of mining-induced dynamic pressure reached 255. 6 m,which is much larger than that in hard rock mining areas in eastern China. Laterally,the zone 0 m-28 m from the roadway is a stable pressure-relief zone, while the zone beyond 28 m is a stress concentration zone. Considering both surrounding rock stability and resource recovery benefits,the optimal retained width of section coal pillars for the working face is determined to be 12 m,and the width of protective coal pillars for the main roadway should be no less than 200 m.

     

/

返回文章
返回